Services

Test it, commission it, and hand it over working

Installed is not the same as working. Commissioning checks the system against what was agreed, with your people and your workflow, and records the result before OMG hands it over.

Pallet racks and a clear aisle inside a warehouse
Warehouse layout example. Stock photo by Tiger Lily / Pexels. Image source. License.
What gets skipped

Where installs are signed off too early

Nobody ran the real workflow

A device that powers on has not proved a receipt, a pick or a label print works end to end.

Printers and scanners are assumed

Formats, media and scan behavior are right in the lab and wrong at the site unless someone checks there.

Acceptance is vague

If acceptance was never defined, the first complaint becomes an argument about what was promised.

What commissioning covers

Functional, connected and accepted

Functional verification
Each device and accessory checked against its configured function.
Connectivity checks
Wireless and network behavior checked where the devices will be used.
Workflow validation
The real workflow run end to end, including an exception, with your people where possible.
Printer and scanner validation
Labels printed and scans read, on the media and codes you actually use.
Device acceptance
A check against the acceptance criteria agreed in scope, recorded by location.
Issue resolution
Issues found during commissioning are worked through before the installation team leaves site, or recorded with an owner where they cannot be closed that day.
RFID

Commissioning RFID is different

An RFID system is commissioned against the read behavior the site and the tagged items actually produce.

Read-zone validation

Reads checked where the tagged items will pass, stop or be stored.

Antenna placement and testing

Antenna position and settings tested and adjusted against the zone.

Tag and media testing

The tags and labels in use tested on the real items.

Reader configuration

Reader settings recorded as part of the handoff.

What commissioning does not promise

Outcomes that depend on the site

Commissioning verifies the system against criteria agreed in advance. It does not promise an outcome the environment decides, such as read performance around metal or liquid, or wireless behavior the site does not support. Where a site limits what is possible, that is recorded and discussed rather than hidden.

After commissioning

The handoff

Training

Operator and administrator training, and the reference material your team keeps.

View training and handoff about Training

Support

What coverage looks like once the project is live.

View support and repair about Support

RFID deployment

The full path for an RFID project.

View RFID deployment about RFID deployment
Common questions

Questions about commissioning

Who defines what acceptance means?
It is agreed in the scope, before installation, so everyone is checking against the same thing.
Does commissioning happen at every site?
It is scoped per project. A rollout can commission each site, or a representative site first and the rest against the same procedure.